STC100 Conversion Wiring and Electrical Component Installation Instructions - On Demand Video

Applies only to Kent's STC conversion kit. These are very detailed instructions. Video is free with purchase oe the full kit below

In this detailed 30-minute instructional video, Kent will walk you through the process step-by-step of how to install the circuit boss and associated wiring to be able to power your auxiliary boost fuel pump and your fuel boost heater when completing your STC 100 conversion. Additional wiring instructions will be included with the dual tank DTC upgrade if you opt to run your diesel on two fuel tanks. 

STC100 Conversion Wiring and Electrical Component Installation Instructions - On Demand Video
$9.99
SKU:
VM-STC100WIRING

Get it for Free! This is available as a free add-on item. Review the product details for bundle options.

On Demand Video

Product Details

Bundle Options. This this item is free when purchased with the following product(s):


How to view this on-demand video:

Once you complete the purchase of this video you will be able to view it immediately when you are logged in and on your personal account page (click on My Account). The video(s) will show up under My Video Manuals. The video is NOT downloadable to your computer or mobile device, but you will be able to view it anytime, from anywhere and from any device as long as you have internet access and you are logged in to your account at mercedessource.com.

Important note: This video manual may or may not include all the information you will need to troubleshoot and/or repair your specific problem/s. Please read the full description carefully to determine if this video is applicable to your year and model and contains the information you are looking for. If not, please refer back to our "Solutions Finder" and enter your chassis number and the specific problem you are having to see if we offer a solution.

Related Products: